I-5 over 41ST DIVISION DR

6.1 N THURSTON CO · County 053, Washington · Built 1954 · 3 Lanes · 60,729 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0004495A0000000
Year Built
1954
Reconstructed
1969
Length
47.9 m (157.2 ft)
Max Span
21.3 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
60,729
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,088,000
Total Project Cost
$4,176,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.