I-5 SBCD over 41ST DIVISION
6.1 N THURSTON CO · County 053, Washington · Built 1954 · 2 Lanes · 7,285 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.104333, -122.588778
This bridge is in worse condition than 57.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 72 years old.
Nearby Bridges
I-5 over 41ST DIVISION DR
Built 1954
I-5 over 41ST DIVISION DRIVE
Built 1969
I-5 NBCD over 41ST DIVISION DR
Built 1969
NCO BEACH RD over AMERICAN LAKE
Built 1995
SEQUALITCHEW ROAD over SEQUALITCHEW CREEK
Built 1950
I-5 over PENDLETON AVE
Built 1957
I STREET over DRAINAGE CANAL
Built 1950
SB ON RAMP over TERRAIN
Built 2020
BERKELEY AVE over I-5
Built 2020
SB OFF RAMP over TERRAIN
Built 2020
Bridge Details
- Structure #
- 0004495B0000000
- Year Built
- 1954
- Length
- 47.9 m (157.2 ft)
- Max Span
- 21.3 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Daily Traffic
- 7,285
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,752,000
- Total Project Cost
- $3,505,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.