MURRAY RD SW over I-5
8.7 N THURSTON CO · County 053, Washington · Built 2020 · 2 Lanes · 8,021 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.12735, -122.54225
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 6 years old.
Nearby Bridges
THORNE RD over I-5
Built 2020
SB OFF RAMP over TERRAIN
Built 2020
BERKELEY AVE over I-5
Built 2020
SB ON RAMP over TERRAIN
Built 2020
GRAVELLY LAKE DRIV over I-5
Built 1959
GRAVELLY LAKE DR over BNRR (NP)
Built 1959
PACIFIC HWY SW over SOUND TRANSIT RAILROAD
Built 1959
MADIGAN AVENUE over MURRAY CREEK
Built 2013
NEW YORK AVE over I-5
Built 1957
PACIFIC HWY SW over CLOVER CREEK
Built 1937
Bridge Details
- Structure #
- 0019133E0000000
- Year Built
- 2020
- Length
- 49.4 m (162.1 ft)
- Max Span
- 47.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,021
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,308,000
- Total Project Cost
- $2,616,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.