MURRAY RD SW over I-5

8.7 N THURSTON CO · County 053, Washington · Built 2020 · 2 Lanes · 8,021 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019133E0000000
Year Built
2020
Length
49.4 m (162.1 ft)
Max Span
47.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
8,021
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,308,000
Total Project Cost
$2,616,000