PACIFIC HWY SW over CLOVER CREEK

.5 NW JCT SR 5 · County 053, Washington · Built 1937 · 5 Lanes · 6,325 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
081239000000000
Year Built
1937
Reconstructed
1970
Length
18 m (59.1 ft)
Max Span
9.1 m
Width
21.9 m (71.9 ft)
Lanes
5
Daily Traffic
6,325
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,042,000
Total Project Cost
$4,085,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.