I-405 N-E RAMP over NORTHUP WAY

4.2 N JCT I-90 · County 033, Washington · Built 2011 · 1 Lanes · 5,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0017726E0000000
Year Built
2011
Length
101.2 m (332 ft)
Max Span
52.1 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
5,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,050,000
Total Project Cost
$4,100,000