SR 520 over PEDESTRIAN TRAIL

0.2 E JCT I-405 · County 033, Washington · Built 1969 · 4 Lanes · 45,466 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0008591B0000000
Year Built
1969
Reconstructed
1993
Length
63.4 m (208 ft)
Max Span
22.2 m
Width
21.1 m (69.2 ft)
Lanes
4
Daily Traffic
45,466
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,508,000
Total Project Cost
$7,015,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.