SR 520 over 120TH AVE NE
0.3 E JCT I-405 · County 033, Washington · Built 1971 · 3 Lanes · 45,466 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
47.632139, -122.181239
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 55 years old.
Nearby Bridges
SR 520 over NORTHUP WAY
Built 1971
I-405 N-E RAMP over NORTHUP WAY
Built 2011
SR 520 E-N RAMP over NORTHUP WAY
Built 1993
SR 520 over PEAT BOG
Built 1993
SR 520 over PEDESTRIAN TRAIL
Built 1969
SR 520 over PEDESTRIAN TRAIL
Built 1966
N-E RAMP over TRAIL
Built 2011
NORTHUP WAY over EASTSIDE RAIL CORRIDOR
Built 1987
I-405 N-E RAMP over 116TH AVE NE
Built 1993
SR 520 over 116TH AVE NE
Built 1966
Bridge Details
- Structure #
- 0009086B0000000
- Year Built
- 1971
- Reconstructed
- 1993
- Length
- 119.5 m (392.1 ft)
- Max Span
- 51.2 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 45,466
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,841,000
- Total Project Cost
- $9,682,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.