NORTHUP WAY over EASTSIDE RAIL CORRIDOR
NORTHUP & 116TH · County 033, Washington · Built 1987 · 3 Lanes · 14,250 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.632869, -122.1848
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 39 years old.
Nearby Bridges
SR 520 over PEDESTRIAN TRAIL
Built 1966
I-405 N-E RAMP over 116TH AVE NE
Built 1993
SR 520 over 116TH AVE NE
Built 1966
SR 520 over PEDESTRIAN TRAIL
Built 1969
SR 520 over 116TH AVE NE
Built 1966
N-E RAMP over TRAIL
Built 2011
SR 520 over PEAT BOG
Built 1993
405 N-E RAMP over 116TH AVE NE
Built 2011
SR 520 W-N RAMP over NORTHUP WAY
Built 1993
I-405 over NORTHUP WAY
Built 1954
Bridge Details
- Structure #
- 085689000000000
- Year Built
- 1987
- Reconstructed
- 2017
- Length
- 19.2 m (63 ft)
- Max Span
- 16.1 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 3
- Daily Traffic
- 14,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $658,000
- Total Project Cost
- $1,317,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.