SR 823 over YAKIMA RIVER

0.1 N JCT I-82 · County 077, Washington · Built 1999 · 2 Lanes · 2,678 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

46.636086, -120.525022

This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
0015137H0000000
Year Built
1999
Length
102.1 m (335 ft)
Max Span
36 m
Width
22.1 m (72.5 ft)
Lanes
2
Daily Traffic
2,678
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,944,000
Total Project Cost
$5,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.