I-82 over YAKIMA RIVER

0.4 E JCT SR 823 · County 077, Washington · Built 1932 · 3 Lanes · 13,121 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

46.629922, -120.515744

This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 94 years old.

Nearby Bridges

Bridge Details

Structure #
0001583A0000000
Year Built
1932
Length
96.6 m (316.9 ft)
Max Span
68 m
Width
11.2 m (36.7 ft)
Lanes
3
Daily Traffic
13,121
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,936,000
Total Project Cost
$5,872,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.