SR 823 over YAKIMA RIVER

0.5 N JCT US 12 · County 077, Washington · Built 1999 · 2 Lanes · 5,356 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0015137C0000000
Year Built
1999
Length
109.7 m (359.9 ft)
Max Span
67.4 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
5,356
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,420,000
Total Project Cost
$6,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.