I-82 over NACHES RIVER
0.5 E JCT SR 823 · County 077, Washington · Built 1932 · 3 Lanes · 24,488 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.630364, -120.515606
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 94 years old.
Nearby Bridges
I-82 over YAKIMA RIVER
Built 1932
I-82 over NACHES RIVER
Built 1960
I-82 over YAKIMA RIVER
Built 1960
SR 823 over NACHES RIVER
Built 1999
SR 823 over YAKIMA RIVER
Built 1999
I-82 over N FIRST ST / SR 823
Built 1959
I-82 over SR 823/N 1ST STREET
Built 1999
REST HAVEN RD over I-82 (US 97) SR 823
Built 1999
US 12 over SR 823 (N 1ST ST)
Built 1969
US 12 over RR & N GORDON RD
Built 1971
Bridge Details
- Structure #
- 0001583B0000000
- Year Built
- 1932
- Length
- 84.1 m (275.9 ft)
- Max Span
- 54.9 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 3
- Daily Traffic
- 24,488
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,753,000
- Total Project Cost
- $5,506,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.