I-5 over PILCHUCK CREEK

2.0 N JCT SR 530 · County 061, Washington · Built 1973 · 4 Lanes · 41,822 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0009130B0000000
Year Built
1973
Length
93.3 m (306.1 ft)
Max Span
30.5 m
Width
21.2 m (69.6 ft)
Lanes
4
Daily Traffic
41,822
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,232,000
Total Project Cost
$10,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.