I-5 over PILCHUCK CREEK

2.0 N JCT SR 530 · County 061, Washington · Built 1954 · 3 Lanes · 41,822 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0004736B0000000
Year Built
1954
Reconstructed
1972
Length
64.9 m (212.9 ft)
Max Span
27.4 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
41,822
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,732,000
Total Project Cost
$5,463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.