HEVLY RD over KOCHS SLOUGH FLOODWAY
0.6 NE JCT SR 530 · County 061, Washington · Built 1981 · 2 Lanes · 71 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.201828, -122.234764
This bridge is in worse condition than 50.6% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
HEVLY RD over STILLAGUAMISH SLOUGH
Built 2005
PIONEER HIGHWAY over STILLAGUAMISH RIVER
Built 1998
236 ST NE over PILCHUCK CREEK
Built 1968
PIONEER HIGHWAY over THOMSEN SLOUGH
Built 1919
PIONEER HIGHWAY over STILLIGUAMISH RIVER
Built 1979
212 TH ST NE over PORTAGE CREEK
Built 1990
236TH ST NE over I-5
Built 1975
OLD 99 over PILCHUCK CREEK
Built 1933
I-5 over PILCHUCK CREEK
Built 1973
I-5 over STILLAGUAMISH RIVER
Built 1933
Bridge Details
- Structure #
- 079669000000000
- Year Built
- 1981
- Length
- 16 m (52.5 ft)
- Max Span
- 5.6 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 71
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,128,000
- Total Project Cost
- $2,256,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.