PIONEER HIGHWAY over STILLAGUAMISH RIVER

2.0 W JCT I-5 · County 061, Washington · Built 1998 · 2 Lanes · 3,693 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
086397000000000
Year Built
1998
Length
71.7 m (235.2 ft)
Max Span
51.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,693
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,426,000
Total Project Cost
$8,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.