PIONEER HIGHWAY over STILLAGUAMISH RIVER
2.0 W JCT I-5 · County 061, Washington · Built 1998 · 2 Lanes · 3,693 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.196456, -122.243853
This bridge is in worse condition than 11.2% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 28 years old.
Nearby Bridges
HEVLY RD over KOCHS SLOUGH FLOODWAY
Built 1981
HEVLY RD over STILLAGUAMISH SLOUGH
Built 2005
PIONEER HIGHWAY over THOMSEN SLOUGH
Built 1919
212 TH ST NE over PORTAGE CREEK
Built 1990
PIONEER HIGHWAY over STILLIGUAMISH RIVER
Built 1979
LARSON RD over SO SLOUGH STILLAGUAMISH
Built 1963
236 ST NE over PILCHUCK CREEK
Built 1968
I-5 over STILLAGUAMISH RIVER
Built 1933
I-5 over STILLAGUAMISH R
Built 1971
236TH ST NE over I-5
Built 1975
Bridge Details
- Structure #
- 086397000000000
- Year Built
- 1998
- Length
- 71.7 m (235.2 ft)
- Max Span
- 51.5 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 3,693
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,426,000
- Total Project Cost
- $8,852,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.