I-5 over STILLAGUAMISH R

0.7 N JCT SR 530 · County 061, Washington · Built 1971 · 3 Lanes · 45,626 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0008791A0000000
Year Built
1971
Length
201.5 m (661.1 ft)
Max Span
61.9 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
45,626
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,733,000
Total Project Cost
$19,466,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.