I-82 over EAST SELAH
2.4 E JCT SR 821 · County 077, Washington · Built 1967 · 2 Lanes · 11,833 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.647375, -120.503406
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 59 years old.
Nearby Bridges
I-82 over EAST SELAH
Built 1967
GOLF COURSE ROAD over DRY WASH
Built 1918
SR 823 over I-82
Built 1998
REST HAVEN RD over I-82 (US 97) SR 823
Built 1999
SR 823 over YAKIMA RIVER
Built 1999
I-82 over NACHES RIVER
Built 1932
SR 823 over YAKIMA RIVER
Built 1999
I-82 over NACHES RIVER
Built 1960
SR 823 over WCRR
Built 1999
SR 823 over SLOUGH AND SR 823 RAMP
Built 1998
Bridge Details
- Structure #
- 0008089B0000000
- Year Built
- 1967
- Length
- 31.7 m (104 ft)
- Max Span
- 13.4 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 11,833
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,038,000
- Total Project Cost
- $2,075,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.