US 395 over 4TH AVE

3.6 N JCT I-82 · County 005, Washington · Built 1958 · 4 Lanes · 16,878 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0005741A0000000
Year Built
1958
Reconstructed
1985
Length
36.3 m (119.1 ft)
Max Span
14.3 m
Width
25.3 m (83 ft)
Lanes
4
Daily Traffic
16,878
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,978,000
Total Project Cost
$3,957,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.