CANAL DRIVE over CID CANAL
.70 E SR 395 · County 005, Washington · Built 1964 · 2 Lanes · 5,206 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.210769, -119.132397
This bridge is in worse condition than 93.4% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 62 years old.
Nearby Bridges
W KENNEWICK AVE over C.I.D. CANAL
Built 1959
W 1ST AVENUE over C.I.D. CANAL
Built 1956
US 395 over SR 240 / W COLUMBIA DR
Built 1954
DAYTON STREET over CID CANAL
Built 2014
SB US 395 over SR 240 E-N RAMP
Built 2009
SR 240 WB over US 395-SR 240 RAMPS
Built 1952
US 395 over NP UPRR & COLUMBIA CANAL
Built 1980
US 395 over CANAL DRIVE
Built 1980
US 395 over CANAL DRIVE
Built 1956
US 395 over COLUMBIA R-RIVERSIDE DR
Built 1954
Bridge Details
- Structure #
- 084996000000000
- Year Built
- 1964
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.9 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 2
- Daily Traffic
- 5,206
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $722,000
- Total Project Cost
- $1,444,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.