US 395 over NP UPRR & COLUMBIA CANAL
4.9 N JCT I-82 · County 005, Washington · Built 1980 · 3 Lanes · 25,140 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.215425, -119.1436
This bridge is in worse condition than 9.6% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 46 years old.
Nearby Bridges
US 395 over CANAL DRIVE
Built 1980
US 395 over CANAL DRIVE
Built 1956
SR 240 WB over US 395-SR 240 RAMPS
Built 1952
US 395 over SR 240 / W COLUMBIA DR
Built 1954
SB US 395 over SR 240 E-N RAMP
Built 2009
US 395 over COLUMBIA R-RIVERSIDE DR
Built 1954
CANAL DRIVE over CID CANAL
Built 1964
W KENNEWICK AVE over C.I.D. CANAL
Built 1959
US 395 over NP UPRR & COLUMBIA CANAL
Built 1956
W 1ST AVENUE over C.I.D. CANAL
Built 1956
Bridge Details
- Structure #
- 0011324B0000000
- Year Built
- 1980
- Length
- 199.3 m (653.9 ft)
- Max Span
- 36 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 25,140
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,164,000
- Total Project Cost
- $18,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.