US 395 over NP UPRR & COLUMBIA CANAL

4.9 N JCT I-82 · County 005, Washington · Built 1980 · 3 Lanes · 25,140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0011324B0000000
Year Built
1980
Length
199.3 m (653.9 ft)
Max Span
36 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
25,140
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,164,000
Total Project Cost
$18,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.