US 395 over COLUMBIA R-RIVERSIDE DR

0.3 N JCT SR 240 · County 005, Washington · Built 1954 · 4 Lanes · 34,219 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
0004195A0000000
Year Built
1954
Reconstructed
1986
Length
768.4 m (2521 ft)
Max Span
158.5 m
Width
20.1 m (65.9 ft)
Lanes
4
Daily Traffic
34,219
Material
Steel Continuous
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,306,000
Total Project Cost
$88,613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.