US 395 over COLUMBIA R-RIVERSIDE DR
0.3 N JCT SR 240 · County 005, Washington · Built 1954 · 4 Lanes · 34,219 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.221744, -119.137192
This bridge is in worse condition than 58.1% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 72 years old.
Nearby Bridges
SB US 395 over SR 240 E-N RAMP
Built 2009
US 395 over SR 240 / W COLUMBIA DR
Built 1954
SR 240 WB over US 395-SR 240 RAMPS
Built 1952
US 395 over NP UPRR & COLUMBIA CANAL
Built 1956
US 395 over NP UPRR & COLUMBIA CANAL
Built 1980
US 395 over CANAL DRIVE
Built 1956
US 395 over CANAL DRIVE
Built 1980
US 395 NB over LEWIS ST
Built 1953
CANAL DRIVE over CID CANAL
Built 1964
SYLVESTER ST over US 395
Built 1966
Bridge Details
- Structure #
- 0004195A0000000
- Year Built
- 1954
- Reconstructed
- 1986
- Length
- 768.4 m (2521 ft)
- Max Span
- 158.5 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 34,219
- Material
- Steel Continuous
- Design
- Arch - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $44,306,000
- Total Project Cost
- $88,613,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.