TR 00TH1 over TH NO 1 OVER I 89

2.3 MI N EXIT 12 · County 007, Vermont · Built 1962 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
2004170D6004171
Year Built
1962
Length
121.6 m (399 ft)
Max Span
21.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.