I 00189 SPUR over I 189 OVER FARRELL

1.1 MI W JCT.I89 EXIT 13 · County 007, Vermont · Built 1962 · 3 Lanes · 36,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200189002W04142
Year Built
1962
Reconstructed
1988
Length
21 m (68.9 ft)
Max Span
20.4 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
36,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,154,000
Total Project Cost
$1,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.