I 00089 ML over I 89 OVER EB I189

EXIT 13 I 89-I 189 INTERS · County 007, Vermont · Built 1962 · 2 Lanes · 41,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
200089066S04142
Year Built
1962
Length
51.5 m (169 ft)
Max Span
26.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
41,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,070,000
Total Project Cost
$2,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.