I 00189 SPUR over I 189 WB OVER I 89
I 89 EXIT 13 · County 007, Vermont · Built 1962 · 2 Lanes · 36,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.4523, -73.182511
This bridge is in worse condition than 16.8% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 64 years old.
Nearby Bridges
I 00089 ML over I 89 OVER EB I189
Built 1962
I 00089 ML over I 89 OVER EB I189
Built 1962
I 00189 RAMP over RAMP E OVER RAMP D
Built 1963
I 00089 ML over I 89 OVER DORSET ST
Built 1963
I 00089 ML over I 89 OVER DORSET ST
Built 1963
I 00189 SPUR over I 189 OVER SPEAR ST
Built 1962
I 00189 SPUR over I 189 OVER SPEAR ST
Built 1962
I 00189 SPUR over I 189 OVER FARRELL
Built 1962
I 00189 SPUR over I 189 OVER FARRELL
Built 1962
US 00002 ML over I 89 UNDER US 2
Built 1962
Bridge Details
- Structure #
- 200189004W04142
- Year Built
- 1962
- Length
- 81.1 m (266.1 ft)
- Max Span
- 23.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 36,800
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,258,000
- Total Project Cost
- $3,309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.