I 00189 SPUR over I 189 WB OVER I 89

I 89 EXIT 13 · County 007, Vermont · Built 1962 · 2 Lanes · 36,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200189004W04142
Year Built
1962
Length
81.1 m (266.1 ft)
Max Span
23.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
36,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,258,000
Total Project Cost
$3,309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.