TR 01 FAS 188 over NEW HAVEN RIVER

4.0 MI E JCT VT 116 · County 001, Vermont · Built 2015 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
200188001901102
Year Built
2015
Length
39 m (128 ft)
Max Span
36.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.