C3045 over NEW HAVEN RIVER

0.01 MI TO JCT W CL2 TH1 · County 001, Vermont · Built 1919 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
100110004701101
Year Built
1919
Length
23.8 m (78.1 ft)
Max Span
22.9 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$476,000
Total Project Cost
$626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.