C2001 over NEW HAVEN RIVER

0.2 MI TO JCT C3 TH 5 · County 001, Vermont · Built 1939 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
100110001401101
Year Built
1939
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$482,000
Total Project Cost
$532,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.