C3033 over NEW HAVEN RIVER

AT JCT TH 33 & C2 TH 1 · County 001, Vermont · Built 1941 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
100110001801101
Year Built
1941
Length
36 m (118.1 ft)
Max Span
17.4 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,029,000
Total Project Cost
$1,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.