I-15 SBL COL-DIST. over UTA LINE to WEST VALLEY
400 W. 2250 SO. SO. SL. · County 035, Utah · Built 1999 · 2 Lanes · 268,370 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.722947, -111.905419
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 27 years old.
Nearby Bridges
RAMP to I-80 EB over ANDY AVE.(2250 S.)&
Built 1999
I15SBCD.Rp. toI80 over 2250 SOUTH ST. & UPR
Built 1999
I-15 (SR-15) SBL over ANDY AVE.(2250 S.)&
Built 1999
I-15 (SR-15) NBL over ANDY AVE.(2250 S.)&
Built 2000
I15 I80 RPs-SR201W over 700 WEST ST. & UPRR
Built 2000
I-15 NB COL-DIST over RT.POND .& UTA TRACKS
Built 1999
I-15 (SR-15) NBL over 2100 SOUTH STREET
Built 2000
I-15NB COL-DIST.RP over DRAINAGE WATER RET. POND
Built 2000
RP.I15NB to SR201W over I-15 & I-15 COL-DIST
Built 2000
I-15 NB COL-DIST. over 2100 SOUTH STREET
Built 1999
Bridge Details
- Structure #
- 3F 654
- Year Built
- 1999
- Length
- 68.9 m (226 ft)
- Max Span
- 68 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 268,370
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.