I-15NB COL-DIST.RP over DRAINAGE WATER RET. POND
I15 I80 SR201 INT.@2400 S · County 035, Utah · Built 2000 · 3 Lanes · 268,370 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.720911, -111.903567
This bridge is in worse condition than 19.5% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 26 years old.
Nearby Bridges
RP.I15NB to SR201W over I-15 & I-15 COL-DIST
Built 2000
I-15 (SR-15) NBL over ANDY AVE.(2250 S.)&
Built 2000
I-15 NB COL-DIST over RT.POND .& UTA TRACKS
Built 1999
I-15 (SR-15) SBL over I80EBL & RAMP FROM S
Built 1999
I-15NB.COL-DIST.RP over I-80 (SR-80) WBL
Built 2000
I-15 (SR-15) SBL over ANDY AVE.(2250 S.)&
Built 1999
I15SBCD.Rp. toI80 over 2250 SOUTH ST. & UPR
Built 1999
RAMP to I-80 EB over ANDY AVE.(2250 S.)&
Built 1999
RP.I80WB to SR201W over I-15 & I15 COL-DIST.RPS.
Built 2000
I-15 SBL COL-DIST. over UTA LINE to WEST VALLEY
Built 1999
Bridge Details
- Structure #
- 1F 622
- Year Built
- 2000
- Length
- 61.5 m (201.8 ft)
- Max Span
- 30.8 m
- Width
- 20.8 m (68.2 ft)
- Lanes
- 3
- Daily Traffic
- 268,370
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.