I-15 (SR-15) SBL over I80EBL & RAMP FROM S
I80-I15 INTCHG.@ 240 · County 035, Utah · Built 1999 · 4 Lanes · 236,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.719456, -111.904889
This bridge is in worse condition than 37.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 27 years old.
Nearby Bridges
I-15NB.COL-DIST.RP over I-80 (SR-80) WBL
Built 2000
RP.SR201EB toI15SB over RAMP I15SB DIST.to I15SB
Built 2000
RP.I15NB to SR201W over I-15 & I-15 COL-DIST
Built 2000
I-15NB COL-DIST.RP over DRAINAGE WATER RET. POND
Built 2000
I-15 (SR-15) NBL over I-80 EBL & COL-DIST.
Built 2000
RP.I80WB to SR201W over I-15 & I15 COL-DIST.RPS.
Built 2000
I-15 NB.COL-DI.RP. over I-80 EBL.& EB.COL-DI
Built 2000
RP.I80WB to I15SB over I-15 (SR-15) & CD.RP
Built 2000
RP.I80WB toI15NBCD over STORM DRN.RETENTION POND
Built 2000
I-15 (SR-15) NBL over ANDY AVE.(2250 S.)&
Built 2000
Bridge Details
- Structure #
- 3C 859
- Year Built
- 1999
- Length
- 123.7 m (405.8 ft)
- Max Span
- 44.3 m
- Width
- 22.5 m (73.8 ft)
- Lanes
- 4
- Daily Traffic
- 236,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.