RAMP to I-80 EB over ANDY AVE.(2250 S.)&

450 WEST 2250 SO. SO.SL. · County 035, Utah · Built 1999 · 3 Lanes · 268,370 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
3C 862
Year Built
1999
Length
41.9 m (137.5 ft)
Max Span
40.8 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
268,370
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.