I15 I80 RPs-SR201W over 700 WEST ST. & UPRR

I15 I80 SR201 INT.@2400 S · County 035, Utah · Built 2000 · 3 Lanes · 9,630 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
4C 841
Year Built
2000
Length
279.7 m (917.7 ft)
Max Span
71.3 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
9,630
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,996,000
Total Project Cost
$6,594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.