I-80EB (SR-80) over INT.X-RD@PARLEYS SUMMIT
At Parleys Summit Intchg · County 043, Utah · Built 2011 · 4 Lanes · 50,380 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
40.752681, -111.614942
This bridge is in worse condition than 24.1% of bridges in County 043. The average bridge in Utah is 0 years old; this one is 15 years old.
Nearby Bridges
I-80WB (SR-80) over INT.X-RD@PARLEYS SUMMIT
Built 2011
I-80 (SR-80) EBL over CO. RD. INTCHG. X-ROAD
Built 1971
I-80 (SR-80) WBL over CO.RD. INTCHG. X-ROAD
Built 1971
I-80WB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
Built 1972
I-80EB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
Built 1972
SR-224 INT.X-RD. over I-80 (SR-80) EBL & W
Built 2000
SR-224 over PEDESTRIAN UNDERPASS
Built 2011
HIGHLAND DRIVE over PED. PATH AND STREAM
Built 2006
I-80 (SR-80) WBL over CO.RD.AT MTN.MEADOW
Built 1970
I-80 (SR-80) EBL over CO.RD.AT MTN.MEADOW
Built 1970
Bridge Details
- Structure #
- 2C1004
- Year Built
- 2011
- Length
- 40.4 m (132.5 ft)
- Max Span
- 39.6 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 50,380
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.