I-80 (SR-80) EBL over CO.RD.AT MTN.MEADOW

.95 MI.E.OF KIMBALL JCT. · County 043, Utah · Built 1970 · 2 Lanes · 51,705 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
2F 183
Year Built
1970
Reconstructed
2007
Length
26.2 m (86 ft)
Max Span
25 m
Width
19.8 m (65 ft)
Lanes
2
Daily Traffic
51,705
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.