I-80 (SR-80) WBL over CO.RD. INTCHG. X-ROAD

JEREMY RANCH INTCHG. · County 043, Utah · Built 1971 · 3 Lanes · 53,725 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
4F 86
Year Built
1971
Length
57.7 m (189.3 ft)
Max Span
21.3 m
Width
18.4 m (60.4 ft)
Lanes
3
Daily Traffic
53,725
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.