I-80EB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
At Lambs Canyon Intchg. · County 035, Utah · Built 1972 · 3 Lanes · 50,480 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
40.7393, -111.672889
This bridge is in worse condition than 79.4% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 54 years old.
Nearby Bridges
I-80WB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
Built 1972
I-80WB (SR-80) over SR-65 INTCHG.X-ROAD.
Built 1972
I-80EB (SR-80) over SR-65 INTCHG. X-ROAD
Built 1972
WATER TREATMENT RD over I-80 (SR-80) EB AND WB
Built 1973
I-80EB (SR-80) over INT.X-RD@PARLEYS SUMMIT
Built 2011
I-80WB (SR-80) over INT.X-RD@PARLEYS SUMMIT
Built 2011
MT. AIRE ROAD over I-80 (SR-80) EBL AND WB
Built 1973
ROAD 80018 over MILLCREEK CREEK
Built 1990
ROAD 80208 over MILL CREEK
Built 1985
INTCHG. X-ROAD. over I-80 (SR-80) EBL & W
Built 1973
Bridge Details
- Structure #
- 2F 254R
- Year Built
- 1972
- Reconstructed
- 2008
- Length
- 26.8 m (87.9 ft)
- Max Span
- 25.6 m
- Width
- 17.3 m (56.8 ft)
- Lanes
- 3
- Daily Traffic
- 50,480
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.