MT. AIRE ROAD over I-80 (SR-80) EBL AND WB
MT. AIRE INTERCHANGE · County 035, Utah · Built 1973 · 2 Lanes · 815 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.739364, -111.742625
This bridge is in worse condition than 99.1% of bridges in County 035. The average bridge in Utah is 0 years old; this one is 53 years old.
Nearby Bridges
WATER TREATMENT RD over I-80 (SR-80) EB AND WB
Built 1973
INTCHG. X-ROAD. over I-80 (SR-80) EBL & W
Built 1973
I-80EB (SR-80) over SR-65 INTCHG. X-ROAD
Built 1972
I-80WB (SR-80) over SR-65 INTCHG.X-ROAD.
Built 1972
ROAD 80208 over MILL CREEK
Built 1985
ROAD 80018 over MILLCREEK CREEK
Built 1990
RP.I80WB TO I2155S over I-80 (SR-80) AND WB
Built 1964
RAMP I80W TO I215S over I-215 (SR-215) NBL &
Built 1966
I-80EB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
Built 1972
I-80WB (SR-80) over LAMBS CYN.RD. INT.X-ROAD
Built 1972
Bridge Details
- Structure #
- 0C 574
- Year Built
- 1973
- Length
- 57.6 m (189 ft)
- Max Span
- 40.8 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 815
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.