6TH EAST over I-15 (SR-15) NBL AND SBL
IN LEHI · County 049, Utah · Built 2018 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.395617, -111.84015
This bridge is in worse condition than 19.3% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 8 years old.
Nearby Bridges
5TH-6TH EAST ST over US-89 (SR-89) & UPRR
Built 1964
I-15 over US-89
Built 2020
I-15 over US-89
Built 2020
I-15 NB over 100 East
Built 2020
I-15 SB over 100 East
Built 2020
I-15 (SR-15) SBL over SR-73 LEHI MAIN ST.
Built 1993
I-15 (SR-15) NBL over LEHI MAIN ST SR-73
Built 1993
600 N in Lehi over Waste Ditch Canal
Built 2017
1350 N in Lehi over Dry Creek
Built 2012
I-15 NB over I-15 OVER 300 WEST
Built 2020
Bridge Details
- Structure #
- 0F 882
- Year Built
- 2018
- Length
- 69.9 m (229.3 ft)
- Max Span
- 33.4 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.