5TH-6TH EAST ST over US-89 (SR-89) & UPRR
IN LEHI · County 049, Utah · Built 1964 · 2 Lanes · 3,518 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.394306, -111.840733
This bridge is in worse condition than 87.2% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 62 years old.
Nearby Bridges
6TH EAST over I-15 (SR-15) NBL AND SBL
Built 2018
I-15 over US-89
Built 2020
I-15 over US-89
Built 2020
I-15 NB over 100 East
Built 2020
I-15 SB over 100 East
Built 2020
I-15 (SR-15) SBL over SR-73 LEHI MAIN ST.
Built 1993
I-15 (SR-15) NBL over LEHI MAIN ST SR-73
Built 1993
600 N in Lehi over Waste Ditch Canal
Built 2017
1350 N in Lehi over Dry Creek
Built 2012
I-15 SB over I-15 OVER 300 WEST
Built 2020
Bridge Details
- Structure #
- 0F 11
- Year Built
- 1964
- Reconstructed
- 2011
- Length
- 63.9 m (209.6 ft)
- Max Span
- 20 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 3,518
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.