600 N in Lehi over Waste Ditch Canal
600 N 200 W in Lehi · County 049, Utah · Built 2017 · 2 Lanes · 464 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.395, -111.852644
This bridge is in worse condition than 19.3% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 9 years old.
Nearby Bridges
I-15 SB over 100 East
Built 2020
I-15 NB over 100 East
Built 2020
5TH-6TH EAST ST over US-89 (SR-89) & UPRR
Built 1964
I-15 SB over I-15 OVER 300 WEST
Built 2020
I-15 NB over I-15 OVER 300 WEST
Built 2020
6TH EAST over I-15 (SR-15) NBL AND SBL
Built 2018
1350 N in Lehi over Dry Creek
Built 2012
I-15 SB over UTA Tracks
Built 2020
I-15 NB over UTA Tracks
Built 2020
I-15 over US-89
Built 2020
Bridge Details
- Structure #
- 049117E
- Year Built
- 2017
- Length
- 6.2 m (20.3 ft)
- Max Span
- 6.2 m
- Width
- 18.3 m (60 ft)
- Lanes
- 2
- Daily Traffic
- 464
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.