I-15 (SR-15) SBL over SR-73 LEHI MAIN ST.
LEHI MAIN ST.INTERCHANGE · County 049, Utah · Built 1993 · 6 Lanes · 145,695 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.3883, -111.833733
This bridge is in worse condition than 48.9% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 33 years old.
Nearby Bridges
I-15 (SR-15) NBL over LEHI MAIN ST SR-73
Built 1993
I-15 over US-89
Built 2020
I-15 over US-89
Built 2020
5TH-6TH EAST ST over US-89 (SR-89) & UPRR
Built 1964
6TH EAST over I-15 (SR-15) NBL AND SBL
Built 2018
INT.SR145 AND PON over UPRR AND UTA TRACK
Built 2010
MEADOW LANE over MILL CREEK WETLANDS
Built 2004
I-15 SB over 100 East
Built 2020
I-15 NB over 100 East
Built 2020
SR-145 EB over I-15 (SR-15)
Built 2010
Bridge Details
- Structure #
- 3C 783
- Year Built
- 1993
- Reconstructed
- 2011
- Length
- 62.4 m (204.7 ft)
- Max Span
- 61.6 m
- Width
- 30.7 m (100.7 ft)
- Lanes
- 6
- Daily Traffic
- 145,695
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.