TURTLE CREEK DR NB over 9TH AVE DITCH
0.5 MI NE OF US 67 · County 245, Texas · Built 1981 · 2 Lanes · 2,591 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.947522, -93.982431
This bridge is in worse condition than 60.7% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 45 years old.
Nearby Bridges
TURTLE CREEK DR SB over 9TH AVE DITCH
Built 1981
REGIONAL DR NB over 9TH AVE DITCH
Built 1981
REGIONAL DR SB over 9TH AVE DITCH
Built 1981
75TH ST SB over 9TH AVE DITCH
Built 1981
75TH ST NB over 9TH AVE DITCH
Built 1981
9TH AVE SB over MAIN B CANAL
Built 1993
9TH AVE NB over MAIN B CANAL
Built 1980
US 69/96/287 over JIMMY JOHNSON BLVD
Built 1990
US 69/96/287 over FM 365
Built 1965
75TH ST SB over MAIN B CANAL
Built 1981
Bridge Details
- Structure #
- 201240C01351001
- Year Built
- 1981
- Length
- 15.2 m (49.9 ft)
- Max Span
- 15.2 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,591
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.