REGIONAL DR SB over 9TH AVE DITCH

0.1 MI NE OF CENTRAL MALL · County 245, Texas · Built 1981 · 2 Lanes · 3,597 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
201240C01087002
Year Built
1981
Length
15.2 m (49.9 ft)
Max Span
15.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,597
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.