US 69/96/287 over FM 365
AT FM 365 · County 245, Texas · Built 1965 · 4 Lanes · 64,527 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.946039, -93.994311
This bridge is in worse condition than 60.7% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 61 years old.
Nearby Bridges
REGIONAL DR SB over 9TH AVE DITCH
Built 1981
REGIONAL DR NB over 9TH AVE DITCH
Built 1981
TURTLE CREEK DR SB over 9TH AVE DITCH
Built 1981
TURTLE CREEK DR NB over 9TH AVE DITCH
Built 1981
S 37TH ST over DRAINAGE DITCH
Built 1965
S 35TH ST over DRAINAGE DITCH
Built 1970
US 69/96/287 over MAIN C CANAL
Built 1960
HARDY AVENUE over DRAINAGE DITCH
Built 1960
US 69/96/287 over JIMMY JOHNSON BLVD
Built 1990
US 69/96/287 NB over NEDERLAND AVE
Built 1975
Bridge Details
- Structure #
- 201240020016141
- Year Built
- 1965
- Reconstructed
- 1974
- Length
- 70.1 m (230 ft)
- Max Span
- 27.4 m
- Width
- 23.7 m (77.8 ft)
- Lanes
- 4
- Daily Traffic
- 64,527
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $34,000
- Total Project Cost
- $43,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.