9TH AVE NB over MAIN B CANAL
1.0 MI SE OF JCT FM 365 · County 245, Texas · Built 1980 · 2 Lanes · 6,853 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.945581, -93.973625
This bridge is in worse condition than 30.9% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
9TH AVE SB over MAIN B CANAL
Built 1993
75TH ST NB over 9TH AVE DITCH
Built 1981
75TH ST SB over 9TH AVE DITCH
Built 1981
75TH ST SB over MAIN B CANAL
Built 1981
75TH ST NB over MAIN B CANAL
Built 1981
TURTLE CREEK DR NB over 9TH AVE DITCH
Built 1981
TURTLE CREEK DR SB over 9TH AVE DITCH
Built 1981
LAKE ARTHUR DRIVE over MAIN B CANAL
Built 1980
REGIONAL DR NB over 9TH AVE DITCH
Built 1981
REGIONAL DR SB over 9TH AVE DITCH
Built 1981
Bridge Details
- Structure #
- 201240C00316001
- Year Built
- 1980
- Length
- 26.2 m (86 ft)
- Max Span
- 26.2 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,853
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.