SH 31 WB over POST OAK CREEK
1.90 MI E OF IH45 · County 349, Texas · Built 1933 · 2 Lanes · 7,826 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
32.101697, -96.409422
This bridge is in worse condition than 90.6% of bridges in County 349. The average bridge in Texas is 0 years old; this one is 93 years old.
Nearby Bridges
SH 31 EB over POST OAK CR
Built 1964
CR SE 0010 over POST OAK CREEK
Built 2007
SH 31 EB over MESQUITE CR
Built 1964
SH 31 WB over MESQUITE CR
Built 1933
CR NE 0070 over BRIAR CREEK
Built 2010
SH 31 over UPRR Corsicana Sub
Built 2020
IH 45 NB EXIT RAMP over UPRR
Built 2003
IH 45 NB over SH 31
Built 1964
IH 45 NBML over UPRR
Built 2003
IH 45 EFR/CR SE 20 over MESQUITE CREEK
Built 1964
Bridge Details
- Structure #
- 181750016301002
- Year Built
- 1933
- Length
- 56.7 m (186 ft)
- Max Span
- 7.9 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 7,826
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,000
- Total Project Cost
- $11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.