SH 31 WB over MESQUITE CR
0.80 MI E OF IH45 · County 349, Texas · Built 1933 · 2 Lanes · 6,122 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.099642, -96.427011
This bridge is in worse condition than 57.6% of bridges in County 349. The average bridge in Texas is 0 years old; this one is 93 years old.
Nearby Bridges
SH 31 EB over MESQUITE CR
Built 1964
IH 45 NB over SH 31
Built 1964
IH 45 NB EXIT RAMP over UPRR
Built 2003
IH 45 SB over SH 31
Built 1964
IH 45 NBML over UPRR
Built 2003
IH 45 SBML over UPRR
Built 2003
IH 45 NBFR over POST OAK CREEK
Built 2000
IH 45 NB over POST OAK CREEK
Built 1964
IH 45 SB over POST OAK CREEK
Built 1964
IH 45 SBFR over POST OAK CREEK
Built 2000
Bridge Details
- Structure #
- 181750016301001
- Year Built
- 1933
- Length
- 22.3 m (73.2 ft)
- Max Span
- 7.3 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,122
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.